CubeSat Failure Rate: Why CubeSats Fail

Bar chart of CubeSat outcomes 1999–2019 by team experience: hobbyist teams 38.7% dead on arrival, 17.3% lost early, 26.7% partial, 17.3% full mission; crafter teams 13.8%, 12.5%, 38.8%, 35%; industrialist firms 9.6% dead on arrival or lost early, 57.1% partial, 33.3% full mission
Download SVG
Embed

Copy this HTML to use the diagram on your site (CC BY 4.0, keep the credit line):

<figure><img src="https://cosmicaxis.space/img/vi-sao-cubesat-that-bai-en.svg" alt="Bar chart of CubeSat outcomes 1999–2019 by team experience: hobbyist teams 38.7% dead on arrival, 17.3% lost early, 26.7% partial, 17.3% full mission; crafter teams 13.8%, 12.5%, 38.8%, 35%; industrialist firms 9.6% dead on arrival or lost early, 57.1% partial, 33.3% full mission" width="600" height="544"><figcaption>Source: <a href="https://cosmicaxis.space/en/cubesat-failure-rate/">CosmicAxis</a> · CC BY 4.0 · Based on: Swartwout, CubeSat Mission Assurance Trends, NEPP ETW 2020, slide 15</figcaption></figure>
Source

Swartwout, CubeSat Mission Assurance Trends, NEPP ETW 2020, slide 15

CubeSats fail most often at the start of the mission: NASA (Jacklin, 2019) found that 41.3% of small satellites launched 2000–2016 failed fully or partly. Among hobbyist teams, 38.7% of CubeSats never made contact (Swartwout, 2020). Power, communications and computer subsystems cause most failures with a known cause.

01Knowledge

How often do CubeSats fail?

About 4 in 10 small satellites do not complete their mission: NASA/TM-2018-220034 by Stephen Jacklin (NASA Ames, 2019) found that 41.3% of small satellites launched 2000–2016 failed: 24.2% failed totally, 11% partially and 6.1% were lost with their rocket. A cheap rideshare on a low rocket launch cost per kilogram also shares the rocket’s risk: the 2006 Dnepr failure lost 14 CubeSats in one launch. The first CubeSat launch in 2003 already showed the range of outcomes: two of six satellites never made contact, while CubeSat XI-IV and CUTE-I were still transmitting after more than 23 years.

Study Sample Result (%) Source, date viewed
Jacklin, NASA Small satellites 2000–2016 Failed 41.3, including launch failures NASA/TM-2018-220034, 2026-10-02
Swartwout, SLU 915 CubeSats in orbit 2000–2018 Dead on arrival 11, full mission 27.9 NEPP ETW 2020, 2026-10-02
Villela et al. 855 CubeSats to 31 May 2018 Success about 75, launch failures excluded IJAE 2019, 2026-10-02
Venturini, Aerospace CubeSats, Swartwout’s data Success 45 (universities), 77 (industry) TOR-2017-01689, 2026-10-02

The numbers differ because “success” is defined differently: Venturini counts satellites that ran for 60 days, while Jacklin treats a satellite with no news after launch as an “assumed failure” and leaves out constellations such as Flock. This article is part of the CubeSat and small satellite track.

What does “dead on arrival” (DOA) mean?

Dead on arrival (DOA) is a satellite that separated from its deployer but never reached an operating state that the ground could detect (Langer and Bouwmeester, 2016). A satellite “lost early” did make contact before it failed.

Langer (TU München) and Bouwmeester (TU Delft) analysed 178 CubeSats launched through 30 June 2014: because of DOA alone, reliability drops to 75.62–87.09% at separation, then to 58.94–73.24% after 100 days (95% confidence interval).

This is the infant mortality zone of the bathtub curve. Swartwout (2020) saw the same pattern: satellites that survive the first 90 days usually live long. An antenna that fails to deploy is one path to DOA: in 2017 the UNSW-EC0 team suspected an undeployed antenna when its satellite stayed silent.

How much do experienced teams outperform newcomers?

A team’s experience decides survival: according to Michael Swartwout (Saint Louis University, 2020), 38.7% of CubeSats from hobbyist teams were dead on arrival, against 13.8% for teams with a track record in small satellites.

Swartwout split 432 CubeSats (1999–2019, constellations excluded) by team experience:

  • Hobbyists (191 satellites): no prior experience, ad hoc process; 17.3% completed the full mission.
  • Crafters (160): had built small satellites on contract; 35% completed the full mission.
  • Industrialists (42): large-satellite makers; dead on arrival and lost early together came to 9.6% (CosmicAxis calculation from the rest of the chart).

Swartwout attributes hobbyist failures to an ad hoc process and too little testing time. Learning from failure is also hard: by December 2018, 146 of 253 CubeSat organizations had built only one.

Is the CubeSat failure rate falling over time?

The failure rate falls slowly, and the direction depends on the dataset. Among hobbyist teams, the dead-on-arrival rate fell from 75% (8 satellites, 2000–2004) to 41.2% (2005–2009), 39.2% (2010–2014) and 34.9% (86 satellites, 2015–2018); Swartwout titled the slide “Are we getting better? No.”

Jacklin, by contrast, found the failure rate rising from 28.6% (2000–2008, 15 satellites per year) to 42.6% (2009–2016, 48 satellites per year), a difference that is statistically significant at the 95% confidence level; he suspected that missions were getting harder while software verification did not keep pace. Villela et al. (2019) saw the success rate rising instead; the studies define and count differently.

Which subsystems make CubeSats fail most often?

The electrical power system (EPS) causes the most failures after separation: according to Langer and Bouwmeester (2016), EPS accounts for 44% of failures in the first 30 days and 36% in the first 90 days.

Bar chart of the share of CubeSat failures by subsystem: at separation EPS 28%, communications 14%, computer 16%, unknown 33%, other 9%; within 30 days EPS 44%, communications 16%, computer 20%, unknown 12%; within 90 days EPS 36%, communications 29%, computer 21%, unknown 14%
Source

Langer and Bouwmeester, SSC16-X-2, 2016, figure 5

At separation “unknown” is 33% because a silent satellite sends no telemetry. The three worst blocks are the EPS, the on-board computer (OBC) and communications including the antenna; attitude control, payload and structure together account for under 10%.

Swartwout (2020) lists common causes of DOA: a crowded schedule that lets software bugs through, stuck mechanisms, a power shortfall; launch shock exposing assembly errors; a link budget with too little margin; two small faults combining; and single-event effects from space radiation.

What are “test like you fly” and day-in-the-life testing?

Test like you fly means testing hardware and software in the configuration, sequence and conditions closest to flight; NASA CubeSat 101 calls it the mantra of CubeSat builders.

Day-in-the-life (DITL) testing is the most concrete form of it:

  • NASA CubeSat 101 (section 6.9.1): run the final flight software, check the timers and the inhibits that block early power-on; any line of code changed afterwards forces a retest.
  • Aerospace Corporation (Venturini, 2017): start as if just separated, command through a ground station, collect payload data, charge the battery over daily cycles and orbital eclipses, for “a few days to a week”.

Builders tend to be optimistic: in the Langer and Bouwmeester survey, 113 developers guessed a 48.98% chance that a university CubeSat fails within 6 months, but only 16.53% for their own satellite. Test order follows the V-model of systems engineering. A similar gap appears in the Ariane 5 flight 501 failure: the simulation used a software module instead of the real inertial reference unit, and the Inquiry Board concluded that the real unit would have exposed the flaw.

02Practice

How do you analyze CubeSat failure rates in Python?

Three calculations below use published numbers and the standard library: the failure rate by period (Jacklin, table 3), a Weibull survival curve (Langer and Bouwmeester), and a series system R = R₁ · R₂ ⋯ Rₙ (CosmicAxis calculation).

import math

# Jacklin, NASA/TM-2018-220034, table 3 — year: (launched, partial failure, total failure)
J = {2000: (18, 0, 5), 2001: (12, 4, 1), 2002: (13, 1, 3), 2003: (20, 2, 4),
     2004: (6, 1, 0), 2005: (12, 2, 3), 2006: (17, 0, 1), 2007: (22, 3, 4),
     2008: (19, 1, 5), 2009: (35, 7, 13), 2010: (31, 5, 8), 2011: (29, 4, 6),
     2012: (35, 6, 14), 2013: (88, 5, 29), 2014: (73, 8, 25), 2015: (44, 0, 18),
     2016: (48, 0, 12)}

for a, b in ((2000, 2008), (2009, 2016)):
    yrs = [J[y] for y in range(a, b + 1)]
    avg = sum((p + h) / n for n, p, h in yrs) / len(yrs)      # mean of yearly rates
    pooled = sum(p + h for _, p, h in yrs) / sum(n for n, _, _ in yrs)
    print(f"{a}-{b}: yearly mean {avg:.1%}, pooled {pooled:.1%}")

# Langer & Bouwmeester 2016, equation 2, t in days
PNZ, BETA, THETA = 0.8146, 0.4797, 4661.7975
R = lambda t: PNZ * math.exp(-(t / THETA) ** BETA)
print(" · ".join(f"R({t}) = {R(t):.1%}" for t in (1, 30, 90, 365)))

# Series system R = ΠRi, splitting R(90) by the share of failures at 90 days (figure 5)
share = {"EPS": 0.36, "COM": 0.29, "OBC": 0.21, "unknown": 0.14}
Ri = {k: R(90) ** v for k, v in share.items()}
print(", ".join(f"{k} {r:.3f}" for k, r in Ri.items()), f"→ ΠRi = {math.prod(Ri.values()):.1%}")
Ri["EPS"] = R(90) ** (share["EPS"] / 2)                       # assume EPS fails half as often
print(f"EPS fails half as often → ΠRi = {math.prod(Ri.values()):.1%}")
# 2000-2008: yearly mean 28.6%, pooled 28.8%
# 2009-2016: yearly mean 42.6%, pooled 41.8%
# R(1) = 80.1% · R(30) = 74.5% · R(90) = 70.1% · R(365) = 60.7%
# EPS 0.880, COM 0.902, OBC 0.928, unknown 0.951 → ΠRi = 70.1%
# EPS fails half as often → ΠRi = 74.7%

Output from Python 3.14 (CosmicAxis calculation):

  • Jacklin’s 28.6% and 42.6% are the mean of the yearly rates; pooling all satellites gives 28.8% and 41.8%, because the yearly mean weights 2013 (88 satellites) the same as 2004 (6 satellites).
  • R(1 day) = 80.1% but R(90 days) = 70.1%: most of the risk is concentrated in the first day.
  • If the EPS fails half as often, 90-day reliability rises from 70.1% to 74.7%. Splitting Ri by raising R(90) to the share is a CosmicAxis assumption, not the paper’s.

What belongs on a pre-delivery checklist for a CubeSat?

The minimum checklist is the four tests that Aerospace Corporation (Venturini, 2017, recommendation 7) treats as mandatory, plus items that block the failure modes above:

  1. Run a DITL test with the final flight software for a few days to a week, then freeze the code (NASA CubeSat 101; Venturini).
  2. Test communications with a real ground station, adding loss up to the equivalent of 5° elevation (Venturini); the receiving station can be a SatNOGS ground station.
  3. Test battery charge and discharge with the complete satellite under real sunlight at least 30% weaker than sunlight in space, then run without sunlight (Venturini).
  4. Test thermal behavior, in vacuum if possible (Venturini).
  5. Reserve one third to one half of the project schedule for integration, verification and testing (Venturini, recommendation 2).
  6. Provide a power-positive safe mode, a hard-reset command from the ground that bypasses the flight software, and the ability to reload software in orbit (Swartwout, 2020).
  7. Build an FMEA table for the EPS, communications and computer first, then draw a fault tree for the event “no signal received” to know which telemetry is needed.

03Reality

What went wrong on RAX-1, and how did RAX-2 fix it?

RAX-1 failed because of its power system: the 3 kg CubeSat of the University of Michigan and SRI International ended its mission after about two months, when the solar panels degraded until power ran out (Spence et al., 2022; the co-authors include two RAX team leads).

RAX was the first CubeSat of the US National Science Foundation (NSF) CubeSat program:

  • 19 November 2010: RAX-1 launched from Kodiak, Alaska, after one year of construction.
  • After more than 60 days: the mission ended. Jacklin adds that RAX-1’s power system generated electromagnetic noise at exactly the UHF frequency of the communication link when the panels were illuminated.
  • 28 October 2011: RAX-2 launched on a Delta II in NASA’s ELaNa-3 batch, at about 10% of RAX-1’s cost, because the team was still intact to fix the design.

The team’s report at the April 2012 CubeSat workshop (Springmann et al.) states that RAX-2’s power system had “fully recovered” from RAX-1’s fault. The lesson: RAX-1 failed in the EPS, the block at the top of the statistics, and a team that keeps its people after a failure can fly again quickly and cheaply.

Where do Vietnamese CubeSats sit in these statistics?

Vietnamese CubeSats appear in appendix A of Jacklin’s report, and that entry shows the limits of the statistics: F-1 (FSpace, 2012) is recorded as “no signal received”, while PicoDragon (VNSC, 2013) is recorded as “assumed failure” only because Jacklin found no article published after launch.

In reality PicoDragon did transmit, and a Japanese amateur radio operator received it before VNSC’s own station, according to VNSC’s announcement. A satellite that worked is still counted as a failure when its result does not reach the sources Jacklin searched: EO Portal, Gunter’s Space Page and the Wikipedia list of CubeSats.

NanoDragon (2021) launched after 2016, so it is not in the report. The lesson for Vietnamese teams, and any new team: publish results after launch, even failures, in English as well, so that your data enters the statistics.

04Milestone

Milestone: check yourself

If you can do all of these, move on to the next article in this phase.

  • Can you tell dead on arrival, lost early and partial success apart?
  • Can you recompute 28.6% and 42.6% from Jacklin's table in Python?
  • Can you name the four minimum tests before handing over a CubeSat?

Frequently asked questions

What is the CubeSat failure rate?

NASA (Jacklin, 2019): 41.3% of small satellites launched 2000–2016 failed fully or partly. Villela et al. (2019): about 75% of CubeSats succeed when launch-vehicle failures are excluded.

What is dead on arrival (DOA)?

DOA is a satellite that separated from its deployer but never reached an operating state that the ground could detect (Langer and Bouwmeester, 2016).

What does test like you fly mean?

Test like you fly means testing hardware and software in the configuration and sequence closest to flight (NASA CubeSat 101).

References

  1. Jacklin — Small-Satellite Mission Failure Rates, NASA/TM-2018-220034 — accessed
  2. Swartwout — CubeSat Mission Assurance Trends, NEPP ETW 2020 — accessed
  3. Swartwout — CubeSat Database, Saint Louis University — accessed
  4. Langer and Bouwmeester — Reliability of CubeSats, SSC16-X-2 — accessed
  5. Villela et al. — Towards the Thousandth CubeSat, 2019 — accessed
  6. Venturini — Improving Mission Success of CubeSats, TOR-2017-01689 — accessed
  7. NASA CSLI — CubeSat 101 (10/2017) — accessed
  8. Spence et al. — Small Satellite Missions for Space Weather, 2022 — accessed
  9. Springmann et al. — On-Orbit Performance of RAX-2, 2012 (archived copy) — accessed

Cite this article

CosmicAxis. (2026). CubeSat Failure Rate: Causes, DOA and Lessons Learned. https://cosmicaxis.space/en/cubesat-failure-rate/